Janssen Pharmaceutica
Janssen Geotherm project & heating network

The challenge
Fuelling Janssen’s R&D with geothermal energy
Our client, Janssen Phamaceutica, wanted to roll out an innovative geothermal programme at its Beerse site in Belgium. This major life sciences construction project aimed to reduce the company’s carbon emissions, increase the supply of renewable energy on site and enable the decommissioning of existing, ageing utility systems.
To achieve this, they needed to tap into a local geothermal reservoir, 2.5km below the surface, installing a fourth generation heat net. This would enable the geothermal energy to provide sustainable heat and cooling for a number of key R&D buildings, with the potential to expand in future, creating a ring to power the entire site.

The role we're playing
This complex project has involved drilling, testing and optimising two wells down into the Dinantian layer to access the reservoir, as well as constructing and starting the new heat net.
An energy building, complete with pump and heat exchanger systems, is being built to connect the energy supply with the site’s hot and cold water networks, and the R&D buildings are being connected to the heat net. Several roads have been excavated, and these will be reinstated as the project reaches its final stages.
From the outset, our construction consultants have worked closely with the Janssen team to make all of this possible. We’ve helped them obtain and comply with subsidies, insurance and permits, and created an integrated project schedule to keep the complex works on track, including resource projections, progress reporting and team coordination.
Our estimation and costing experts have provided cost forecasting, risk assessments and reporting, as well as estimate validation, savings capture and payment application reviews. Crucially, as the project involved 24-hour drilling, we implemented a rapid-turnaround daily change control procedure to ensure cost certainty and manage scope change.
The results
This project builds on Pulse Consult’s close working relationship with Janssen, and our growing portfolio of life sciences construction projects. Once complete, it will enable the Janssen team to power 30% of the site (and 2% of its global operations) using renewable energy, reducing its carbon emissions by 30% at Beerse and 1.5% worldwide.

Construction consultancy services provided on this project
- Construction planning & project controls
- Planning & scheduling
- Risk management
- Estimation & costing
- Scope & change management
The stats
2.5km
below ground geothermal energy tapped into
4th
generation heat net installation
30%
reduction in site CO2 emissions

Services provided for this project
Arrange a meeting
Like to talk about construction consultancy for your next project?