Mellors Group
The Cube, London
Sectors
Project Value
£8m
Project Location
Canary Wharf, London
The challenge
Bringing a hit ITV gameshow to life
Mellors Group are a major name in events and attractions, entertaining millions of people in the UK and overseas. At London’s Canary Wharf, they wanted to create The Cube, an immersive live experience and cutting-edge socialising concept based on the hit ITV show.
With an internationally spread design team, neighbouring live businesses, demanding engineering elements and an intricate, high-spec fit-out, this ambitious commercial construction project called for an experienced, cool-headed project management team.
The role we played
The client brought in Pulse Consult because of our extensive experience in commercial and hospitality construction. We provided project management, quantity surveying, employer’s agent, principal designer and CDM services, from inception right through to operation.
We managed an internationally spread design team and played a key role in stakeholder and contractor management throughout the delivery of the JCT Design and Build (2016) contract. As the main source of contact for the project, our team provided consistency and problem solving, including overcoming challenges with the landlord and neighbouring tenant.
One of the project’s most complex elements was creating a 150m2 opening in an existing reinforced concrete floor – a huge engineering task that had to be carried out without disrupting the hotel above or restaurant below. Space was critical, right down to the millimetre, with a unique, intricate fit-out required to achieve the client’s vision.
Construction consultancy services provided on this project
- Project management consultancy
- Procurement advice & management
- Project programming & planning
- Stakeholder management
- Value management
- Risk management
- Quality management
- Employer’s agent
- Quantity surveying & cost consultancy
- Measurement, estimation & costing
- Main contract tendering & tender analysis
- Contract documentation
- Feasibility studies
- Cost control (pre & post)
- Principal designer & CDM services
- Health & safety management
- Site audits & inspections
- General risk assessments
- PCIP & CPP
The result
Our commercial construction consultants successfully navigated a whole range of challenges to help Mellors Group transform a shell and core build into a stunning 2,500m2 immersive entertainment venue, right in the heart of London.
The finished venue features 21 cubes, two food offerings and five bars, set across four floors. From the moment you walk in, it has a distinctive feeling that exactly replicates the gameshow as a live, in-person experience – and the response from both the client and the public has been very positive.
The stats
2.5k m2
unique venue
21
cutting-edge cubes installed
The team at Pulse have guided the delivery of the construction of our premium entertainment venue The Cube at Canary Wharf with professionalism and efficiency. We look forward to working with them on the successful delivery of further projects to bring our unique brand of entertainment across other cities in the UK.
Joe Cooper
|Operations Manager
|Mellors Group
Services provided for this project
Arrange a meeting
Like to talk about construction consultancy for your next project?
Get in touch with Emma Atkins today.